Please click here for the very latest pictures on construction at Waterlands.

 
Below you can find pictures of the construction which is going on at Waterlands Bonaire.

1






2










3














4












 




5


6

7

8

9

10

 
 

 

 



These pictures were taken on March 30:

Palapa's

Palapa

Palapa

Palapa

Overview

Plastering sides of porches

 

These pictures were taken on March 19th.

Pool

Pool

Waterfall at pool

Pool area

Pool area

Pool area

Palapa at pool

Palapa at pool

Locks front door

Locks inside

Doors on porch from outside

Overview

Overview terrain

Loop road

Loop road

From outside shower to porch

From outside shower to porch


Leveling terrain

Leveling terrain

Leveling terrain
 
Leveling of terrrain
 
Leveling of terrain


These pictures have been taken on February 29th:

 
 

Closet bedroom

Closet bedroom

Closet bedroom

Closet bedroom

Drainage system terrain

Drainage system terrain

Terrain

Locks and hinges

Outside shower

Pool bar area dug out

Natural stone cascade

Pool


These pictures were taken on January 30th:

Ditch with all cables and earth

Overview

Overview

Overview

Pool

Inside wall completely plastered

Left side of inside wall plastered

Outside wall completely plastered


 
These pictures were taken on December 7th:
 
 

Outside wall at entrance

Outside wall at entrance

Outside wall at entrance

Swimming pool and pump room/bathroom area

Outside wall

Outside wall

Outside wall

Outside wall

Outside wall

Cottages


 
These pictures were taken on November 30th:
 

Outside wall

Outside wall

Outside wall

Outside wall

Office

Ditch for cables

Ditch for cables

Ditch for cables


 
These pictures were taken on November 26th:

Outside wall

Outside wall

Outside wall

Outside wall

Tiles outside shower area

Tiles outside shower area

Doors and windows

Doors and windows

Doors and windows

Doors and windows

Doors and windows

Doors and windows

Doors and windows

Outside wall at entrance

Outside wall at entrance

Plasterwork outside

Bathroom/Pump room at swimming pool


 
 
These pictures were taken on November 16th:
 
 

benches painted

outside wall

outside wall

outside wall

outside wall

outside wall

Pool

Pool

Electricity house painted

Inside paint

Inside paint

Inside paint

Tiles masterbathroom Model II & III

Tiles masterbathroom Model II & III

Tiles masterbathroom Model II & III

Lower side plastered and painted

Lower side plastered and painted


These pictures were taken on November 9th:

 

Pool

Pool

Pool

Pool 

Painting inside

Painting inside

Painting inside

Natural stone wall at waterfront

Natural stone wall at waterfront 

Natural stone wall at waterfront

Foundation outside wall

Foundation outside wall

Foundation outside wall

Foundation outside wall

Foundation outside wall

 Foundation outside wall 

Office/laundry 

Stairs to waterfront 

 Stairs to waterfront

'Work floor' 

 'Work floor'

'Work floor'

These pictures were taken on October 18th:

Tiles laundry 

Wall on waterfront 

Wall on waterfront 

Wall on waterfront 

Wall on waterfront 

Swimming pool 

 Swimming pool

Swimming pool 

Electricity house 

Electricity house 

Electricity house

 

Webniches

Stairs to waterfront 

Stairs to waterfront  

Stairs to waterfront  

Stairs to waterfront  

First layer of paint 

First layer of paint 

First layer of paint

First layer of paint

 First layer of paint

Location outside wall on front 

Location outside wall on side


These pictures were taken on October 4th.

 

Office/Laundry/Storage room

Natural stone for outside wall terrain

Porches, pilars and pergolas painted

Porches, pilars and pergolas painted

Porches, pilars and pergolas painted

Watersealed pergolas

Terrain at waterfront entirely cleaned

Terrain at waterfront entirely cleaned

Communal and private walkways to water prepared for construction of stairs

Communal and private walkways to water prepared for construction of stairs

Outside showers plastered

Outside showers plastered

Floor of outside showers at model I

Second bathroom model II

Masterbathroom Models II & III

Masterbathroom Models II & III

Masterbathroom Models II & III

Electricity building

 

The pictures below were taken on August 24th.

 
 

Outside shower area 

Outside shower area 

More outside shower area

Outside Shower area  

Concrete benches Models II and III 

Concrete benches model II and III 

Kitchen Model II and III 

Kitchen Model II and III 

Kitchen Model II and III 

Kitchen Model II and III 

Kitchen Model II and III 

Kitchen Model II and III 

Ceiling  

Ceiling 

Cove masterbedroom model II and III 

Cove masterbedroom model II and III 

Cove second bedroom model II and III 

Pergola on porch painted with watersealer 

Porch  

All septic tanks are finished 

Water pipe system 

With possibility to operate individually